Krishna Logo
qa training in canada now
Divied
Call: Anusha @ 1 (877) 864-8462

 

Latest News
Home Navigation Divied
INTERVIEW Navigation Divied MANUAL TESTING
Showing 241 - 250 of 510 Previous | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | Next
MANUAL TESTING
 
241What Is Retesting?
Date Posted: 06/27/2012

Retesting is nothing but verifying whether the bug has been fixed correctly.

 
 
242What Is The Difference Between Win Runner And Rational Robot?
Date Posted: 06/27/2012

Ans: Win runner is a functional test tool but rational robot is capable of both functional and performance testing. Win runner has 4 verification points and Rational robot have 14 verification points.

 
 
243What Information Do You Report With Bug?
Date Posted: 06/27/2012

 Summary

Description

Steps to reproduce

Build number and release version

Review

Attachment of failures

Hardware and software

 
 
244Do You Fill Bug Priority? How Do You Decide?
Date Posted: 06/27/2012

 Priority is decided by development lead. Guidelines to fill priority are as follows

Priority

Urgent: Must fix immediately

Very high: Must fix as soon as possible

High: should fix before product release

Medium: Fix if there is time

Low: May be postponed

 
 
245Do You Fill Bug Severity? How Do You Decide?
Date Posted: 06/27/2012

Ans: Yes, I fill severity while reporting the bug

Severity

Critical: Bug causes the system crash or data loss

Major: Bug causes major functionality problems

High: Bug causes partial functionality problems

Medium: Bug causes data validation issues

Low: Bug contains typos, unclear wording or error messages in low visibility fields.

 
 
246What Do You Like Most About Testing?
Date Posted: 06/27/2012

Ans: There are many answers that can be given for this question. Few of them are
The process of hunting down the bugs
The experience and background you have been focused on enhanced testing techniques
You like to be in last phase of work before product reaches the customer.

 
 
247Did You Observe Any Application Logs During Test Execution?
Date Posted: 06/27/2012

Yes. We do observe logs of the application server to check whether the server has thrown any runtime errors.

 
 
248How Do You Know That Build Is Ready For Testing?
Date Posted: 06/27/2012

 In our project automatic build creation and deployment happens on every Sunday. We receive a confirmation mail on every Monday morning about successful deployment along with URL for testing.

 
 
249What Is Difference Between System Testing And Integrating Testing?
Date Posted: 06/27/2012

Ans:  For system testing, the entire system as whole is checked whereas for integrating testing, the interactions between individual modules are tested.

 
 
250What Tools Are Used For Build?
Date Posted: 06/27/2012

There are lot of options for creating build, ranging from the simple make files and batch files to build system like Ant, NAnt, MSBuild, etc

 
Showing 241 - 250 of 510 Previous | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | Next
Shadow Bottom
 
 
© 2005 -